Power Plant Auto Control

Objective

To enable participants to line up, test, commission and maintain all control loops along with their hardware components.

Who may attend
Engineers with 2-3 years experience in the relevant field.
Institute Information
Name of Institute
Neyveli
Duration
1 week
Application Fees to be Submitted
0
  • Auto Control Action Theory (PID) and their relevance to process reaction rate and dead time.
  • Auto loops in Power Station with their built up action Hardware and Software.
  • Selection and application of final control elements such as control valves, dampers, etc.
  • Feed forward and feed back signal selections.
  • Actuators: electric, Pneumatic and Hydraulic; their relative merits and applications.
  • Thyristor drives and thyristor controlled drives.
  • Limit switches and Torque switches
  • Coordinated control concept and applications.
  • Microprocessor based programmable logic controllers (PLC