The main objective of the course is to create technically trained manpower readily available for recruitment to the power companies in the area of Transmission & Distribution of electrical power.
Program Profile | Duration |
---|---|
General Introduction Power Senerio & General Introduction | 1 week |
Power Generation Thermal Power Plant Familiarization | 1 week |
Power Transmission Lines Engineering and O&M | 2 weeks |
Live Line Maintenance Technique | 1 week |
Substation Planning & engineering | 1 week |
Substation Operation & Maintenance | 1 week |
Load Despatch & Grid Management | 2 weeks |
Communications in Power Systems | 1 week |
Power Distribution /Distribution Lines/Cable | 1 week |
Systems Engineering O&M | 2 weeks |
Distribution Sub-Stations | 1 week |
Distribution Metering | 1 week |
Energy Audit and Conservation in Distribution Systems | 1 week |
Information Technology Office applications | 1 week |
In T & D Power System Planning Studies | 1 week |
Safety, Statutory Safety & Statutory regulations | 1 week |
Commercial aspects Commercial aspects in T&D systems | 1 week |
Management of Electrical Contract | 1 week |
New Technologies Power System Protection | 1 week |
High Voltage Testing Power System Equipment | 1 week |
HVDC Transmission System | 1 week |
Simulator Training/Lab Simulator Training, Relay Testing | 1 week |
Appraisal | 1 week |
Total 26 Weeks
Prospectus PGDC in T and D at PSTI, Bangaluru.
Click here for Application Fee Payment.
Instruction for Payment :
State of Corporate/Institution : Haryana
Type of Corporate/Institution : Educational Institutions
Educational Institutions Name : NATIONAL POWER TRAINING INSTITUTE
Select Payment Category : Institute Fee
Course Fee:
1,45,000 non sponsored
1,90,000 sponsored