04-07-2025 |00:00:00 Screen Reader Access Skip to Content Sitemap

Assessment of existing transmission corridor/ infrastructure feasibility for evacuating additional 100 Percent power over & above the existing hydropower with upcoming RE

Objective

To familiarize the Utility Engineers with the Assessment of existing transmission corridor/ infrastructure feasibility for evacuating additional 100 % power over & above the existing hydropower with pcoming RE.

Who may attend
Hydro Power Engineers
Institute Information
Name of Institute
Faridabad
Duration
3 Days
Date of Commencement