Objective

To acquaint the engineers working in C&I areas with advanced Technologies in C&I with  relative  process/plant behaviors

Who may attend
Engineers with 2-3 years experience in the relevant field.
Institute Information
Name of Institute
Durgapur
Duration
3 Days
Application Fees to be Submitted
0
  • General description of Power Station Instrumentation
  • Advanced Technologies in  C&I
  • Temperature Measurement
  • Flow Measurement
  • On-Line  Analytical Instrument
  • Turbovisory Instruments & Vibration Analysis
  • Various  Protection and Interlocks
  • Automatic  Control Loops