In order to share enormous training information at the door step of Power Utilities and Engineering Institutes as well as in house training. A Multimedia Computer Based Training (CBT) Center has been established at NPTI's Corporate Office and its Regional Institutes for developing Multimedia CBTs on various Technical areas concerning Power Generation like : Thermal,CCGT/Gas,Thermal,Hydro,Renewable Transmission & Distribution and Management Areas.
Open Learning Centers (OLCs) have also been established at all Regional Institutes for Self Learning at learner's own choice and pace without any help of the subject experts. CBT has been identified as one of the most cost effective means of delivering consistent high quality training. So far NPTI has developed more than 55 Multimedia CBTs for power professionals and has been marketing them at reasonable prices to the Utilities and Educational Institutes.
Besides in house training in NPTI, these Multimedia CBT packages are being utilized by various Power Utilities as well as Engineering Institutes for upgrading and enhancing their knowledge and skill.
Power Utilities / SEBs | Engineering Institutions |
---|---|
BHEL, MSEB, RRVUNL, NTPC, NHPC, NPC, PSEB, TNEB, OHPC, NLC, DVB, KLTPS, DVC, WBPDCL, IPPGCL, BBMB, BSES, TATPOWER, THERMAX, ACC, APSEB, NDPL, UPRVUN, BSEB, WSEB, etc. | G.B Pant University of Agric. and Technology, NIT Raipur, NIT Durgapur, Jawaharlal Nehru Technological University (AP) Kalyani University (WB), CMERI, VNIT (Nagpur) Delhi College of Engineering, Bharati Vidyapeeth, Deemed University, Pune etc. |
Advantages of Multimedia CBT
- Interactive
- Cost effectiveness
- Provides instant feed back
- Learner driven and not trainer driven
CBT Application Areas
- System description
- Process modeling
- Equipment operation
CBT Packages are Developed in the Areas of
- Thermal Generation
- CCGT
- Hydro Generation
- Transmission & Distribution
- Management
- Renewable
Multimedia Computer Based Training (CBT) Packages
Sr. No. | Name of the Multimedia CBT Package | Price of 1st copy | Price of 2nd, 3rd, & 4th copy | All other copies |
---|---|---|---|---|
Coal Thermal | ||||
A) Boilers | ||||
1 | Combustion System in Boilers | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
2 | Boiler Drum and Drum Internals | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
3 | Super Heater, Re-heater and De-Super Heater | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
4 | Air Heater | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
5 | Fuel Handling System, Feed Heating System & Exhaust System | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
6 | CFB Boiler | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
B) Turbines | ||||
7 | Water/Steam cycle of a Thermal Power Plant | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
8 | Steam Turbine Construction | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
9 | Turbine Governing System (KWU) | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
10 | Regenerative Feed Heating System | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
11 | Turbine Vacuum System | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
12 | HP-LP Bypass System | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
13 | Turbine Lubricating Oil System | Rs.15,000/- | Rs.10,000/- | Rs.8,000/- |
14 | P. I. D. Control | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
C) Generators | ||||
15 | Working Principles of Generator & Electrical Systems in a Thermal Power Station | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
16. | Generator Construction | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
17. | Generator Excitation System | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
18. | Generator Seal Oil System | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
19. | Generator Cooling System | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
D) Auxiliaries | ||||
20. | Power Station Fans | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
21. | Electrical Motors in Power Station | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
22. | Coal Mills & Milling Systems | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
23. | Electrostatic Precipitators | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
24. | Cooling Water System | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
25. | Compressed Air, Water Treatment & Fire Prevention Systems | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
26. | Lub Oil Handling System | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
27. | Coupling for Power Transmission | Rs.15,000/- | Rs.10,000/- | Rs.8,000/- |
28. | Pumps used in Power Station | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
29. | Boiler Feed Pump for Power Station | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
30. | Valve Maintenance | Rs.15,000/- | Rs.10,000/- | Rs.8,000/- |
CCGT/Gas Thermal | ||||
31. | Combined Cycle Gas Turbine (CCGT) Plant | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
32. | Gas Turbine | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
33. | Control System of CCGT Plant | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
34. | Water Treatment of CCGT | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
Hydro | ||||
35. | Hydro Generator Construction | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
36. | Silting Problems in Hydro Power Plants | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
37. | Hydro Turbine | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
38. | Hydro Environment interface | Rs.15,000/- | Rs.10,000/- | Rs.8,000/- |
39. | Hydro Generator Protection | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
40. | R & M for Hydro Power Station | Rs.10,000/- | Rs.8,000/- | Rs.6,000/- |
T & D | ||||
41. | Power Transformers | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
42. | Condition Monitoring of Power Transformers | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
43. | Maintenance of Power Transformers | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
44. | Power Station Switchgear | Rs.40,000/- | Rs.25,000/- | Rs.15,000/- |
45. | Switchgear Maintenance | Rs.25,000/- | Rs.15,000/- | Rs.12,000/- |
46. | Sub Station Maintenance Management |